Westacre Day minus 41
Today some amazing progress was made in the bungalow. Andy the electrician brought two of his mates. They drilled holes in the walls, and all of them have satisfying wires hanging out of them now.
Hilde thought she was going to do a quick wall paper stripping job in preparation for some tiling, but ended up removing several layers of paint as well.
Alex finished the very last of the plumbing, ready for the man to come and install the boiler on Monday. He also spent ages drilling holes through porcelain floor tiles to fix the toilet in the shower room.
Roger started fixing some of the holes in his ceiling, but had a setback when the plasterboard started sagging dangerously. Hopefully this can be corrected without too much fuss in the morning.
Great to hear you’re making progress!
Thanks, Jonathan. It’s finally getting to the stage where it is more like redecorating, not just doing stuff that nobody will ever notice.